Happy Holidays and New year from the EMDB! Please be advised that the EMDB team will be operating at reduced capacity between December 15th - January 12th. With this in mind we would ask that you be prepared for longer reply times through both our helpdesk system and the OneDep deposition system. well done on a productive 2025, wishing you all the best and we will see you in 2026!

EMD-41302

Single-particle
5.4 Å
EMD-41302 Deposition: 21/07/2023
Map released: 16/08/2023
Last modified: 28/02/2024
Overview 3D View Sample Experiment Validation Additional data Links
Overview 3D View Sample Experiment Validation Additional data Links

EMD-41302

Lassa GPC trimer in complex with Fab GP23

EMD-41302

Single-particle
5.4 Å
EMD-41302 Deposition: 21/07/2023
Map released: 16/08/2023
Last modified: 28/02/2024
Overview 3D View Sample Experiment Validation Additional data Links
Deposited maps
Colour Filename Category Contour level View
Author Estimated*
emd_41302.map.gz Primary map 0.13 Apply
emd_41302_half_map_1.map.gz Half map -
emd_41302_half_map_2.map.gz Half map -

Please note: maps may be downsampled for visualisation, to view the original resolution map please download the map and drag and drop into the mol* online viewer.