EMD-25601

Single-particle
3.8 Å
EMD-25601 Deposition: 30/11/2021
Map released: 13/07/2022
Last modified: 13/07/2022
Overview 3D View Sample Experiment Validation Additional data Links
Overview 3D View Sample Experiment Validation Additional data Links

EMD-25601

Map of the wt IRES eIF5B-containing 48S initiation complex, closed conformation. eIF5B in position 2

EMD-25601

Single-particle
3.8 Å
EMD-25601 Deposition: 30/11/2021
Map released: 13/07/2022
Last modified: 13/07/2022
Overview 3D View Sample Experiment Validation Additional data Links
Deposited maps
Colour Filename Category Contour level View
Author Estimated*
emd_25601.map.gz Primary map 0.0131 Apply
emd_25601_half_map_1.map.gz Half map -
emd_25601_half_map_2.map.gz Half map -

Please note: maps may be downsampled for visualisation, to view the original resolution map please download the map and drag and drop into the mol* online viewer.